New Home Construction

At ROC Home Pros, we specialize in building high-quality, custom homes that combine timeless design with modern living. From lakefront luxury homes to stylish suburban builds, we bring your vision to life with expert craftsmanship, transparent communication, and a seamless build process.

Custom Home Builds

Designed to reflect your unique lifestyle, needs, and aesthetic.

Design-Build Services

We manage your project from concept to completion, including design, planning, and construction.

Features

Smart layouts, quality materials, and sustainable building practices for long-term performance.

Budget-Friendly New Builds

Options that balance affordability with craftsmanship and style.

Building Your Future, Stress-Free

We understand that building a new home is a major investment. That is why ROC Home Pros prioritizes clarity, collaboration, and care throughout the entire process — from initial consultation to handing over the keys.

Let’s Build Your Dream Home

Ready to get started on your new home build? Contact us for a consultation, and let’s explore your options.

New Build Timeline Overview

Thank you for choosing ROC Home Pros for your new home build! This timeline provides an overview of the major steps in the construction process. While this is a rough estimate, we’ll refine it as we finalize plans and selections.

Finalizing Plans & Permitting (20 Days)

After finalizing your plans, we will submit them for permitting.

Finalizing Plans & Permitting (20 Days)

Site Preparation & Bidding (20 Days)

Once plans are approved, we will send them to subcontractors for bidding. You will select all finishes (tile, flooring, trim, lighting, appliances, cabinets, vanities, etc.). Land clearing and site preparation to follow. Custom truss and floor joist packages will be ordered (6-week lead time). Windows and exterior doors will also be ordered (up to 12 weeks).

Site Preparation & Bidding (20 Days)

Framing & Structural Work (30-45 Days)

After determining the foundation type (slab or basement), we will lay the foundation.

Framing & Structural Work (30-45 Days)

Mechanical Systems (30-45 Days)

Once the home is watertight (roof, windows, and doors installed), we will proceed with plumbing, electrical, and HVAC installations. The lighting design will be finalized.

Mechanical Systems (30-45 Days)

Insulation & Drywall (30-40 Days)

All rough inspections, including framing, will be completed. Upon passing inspections, we will proceed with insulation, followed by the insulation inspection and drywall installation. Taping and painting will then be completed.

Insulation & Drywall (30-40 Days)

Exterior Completion (15 Days)

The exterior of your home (siding) will be completed before the interior finishes.

Exterior Completion (15 Days)

Interior Finishes (45-64 Days)

Choices made in finishes will significantly affect the timeline. White painted trim is faster than stained trim. Carpet and Luxury Vinyl Planks install quicker than hardwood or tile. Flooring, cabinets, countertops, and other interior elements will be installed.

Interior Finishes (45-64 Days)

Fixtures & Appliances Installation (5 Days)

After painting, floors, and trim work are completed, fixtures and appliances will be installed.

Fixtures & Appliances Installation (5 Days)

Final Inspections (10 Days)

The city will conduct inspections to ensure all work complies with building codes. Once approved, we will receive your Occupancy Certificate

Final Inspections (10 Days)

Punch List

Closing & Move-in

Congratulations! It’s time to enjoy your brand-new home.

Closing & Move-in

Estimated Total Timeline: 6-9 Months

The timeframe may vary depending on your finish selections, home complexity, and permit processing time.